RM094 – Softfall and Mulch Inspection and Maintenance

Trades required: Playground maintenance contractor

Time to complete: Approx. 1–2 hours, depending on the number of play areas

Potential disruptions: Playground areas may need to be closed while surfaces are checked or topped up.

Description:

A contractor checks the soft matting, mulch or rubber surfacing under play equipment to make sure it still cushions falls properly. This helps reduce the risk and severity of injuries from falls.